Destruction opposite my condo 5

Since my last blog on 21 Oct, work continued on planting turfs at the top of the compound. The turfs were delivered to the side of the road and the workers loaded them onto wheelbarrows and took them up the hill. This was an encouraging sign as presumably they won't be doing any construction here.



Meanwhile the digger dug out the area by the main hut, leaving a very steep slope - note the ladder that has been put in place. The main hut was emptied and the floor removed.


But only a few days before people were installing the water tanks above the shower/toilet block.

11th Nov the JCB moved out, which was a good sign.

The fence panels were replaced after it left. The next day there was no sign of any  workers. So it looks like things have come to a standstill.....................

UPDATE -
The workers  moved out all their stuff one evening. But about 2 days later, a couple were back doing the turfs at the top behind the fence. And the night watchman was back.

Nov 22 the digger came back and started noisely moving the earth in front of all the shacks. I have no idea what they are doing.
Nov 27 they removed the main 'building' and levelled out the area. The next day they started building again and had installed an electric box.